Click here to view a photo gallery
of new building photos.
|
 |
Painting and Decorative precast installation.
|
New curbing, asphalt, side railing, Baptismal railing, Ice storage tanks, new entrance sign, chiller pumps.
|
 |
 |
New steeple addition, fire sprinkler install, curbing & grading for asphalt, gym air conditioning, kitchen hood w/ fire suppression, duct work, kitchen propane tank, and soffit/fascia install.
|
Action starts again with kitchen hoods, Fire Sprinkler system (orange pipe), Painting, concrete curbing/sidewalk, steeple, Ice storage tanks, and Baptismal remodel.
|
 |
 |
October/November 2009's Progress
Additional fire line inspections, front yard drains, loxon primer applied prior to painting.
|
September 2009's Progress
Multiple trades installing electrical/security pre-wire, a.c. ductwork, elevator rough-in, core drilling, & fire wall construction @ Youth room. Steel piping for Chilled water system.
|
 |
 |
August brought about completion of exterior tower framing & install, stucco completion, and arrival of Electricians, HVAC, and Plumbers hard at work on the first floor interior. Second floor framing is 90% finished, kitchen hoods and elevator equipment onsite.
|
July progress includes starting exterior stucco, installation of trusses & sheathing, first floor plumbing, windows installed in gym & partial meeting room, interior metal framing on first floor, concrete/block enclosure for walk-in coolers, and continued work on metal fascia /soffit on 2nd floor.
|
 |
 |
Completion of steel structure, 2:00a.m. concrete pour on 2nd floor, concrete block on second floor and gymnasium roof & insulation
|
Project is Pushing Forward with the installation of the block walls, concrete tie beams, structural steel I-beam supports, 2nd floor concrete slabs and stairways.
|
 |
 |
The slab has been poured and walls are begining to form.
[click photo to zoom in]
|
Preparing the grounds.
[click photo show to zoom in]
|
 |
 |
A wall has been constructed around the property and piping has been laid.
[click photo show to zoom in]
|
August brought us grass seed!
|
 |
 |
July 2008's Progress
Once July rolled in, no one could believe their eyes, a pond! Things are starting to take shape. God is good!
|
|
June 2008's Progress
June saw the beginning of the new pond and prepping of the new build site.
|
 |
 |
May 2008's Progress
During the month of May, exciting progress was made in clearing and cleaning up the property in preparation for the next phase of construction.
|
|
May 2008's Progress Continues
With each new day, came new progress and with new progress came new pictures to share.
|
 |
 |
April 2008's Progress
We broke ground on April 11, 2008. They cut all the trees and mulched the limbs and roots.
|
|
|
 |
|
|
|
|