Click here to view a photo gallery
of new building photos.


March 2010's Progress

  Painting and Decorative precast installation.


February 2010's Progress

  New curbing, asphalt, side railing, Baptismal railing, Ice storage tanks, new entrance sign, chiller pumps.


January 2010's Progress

  New steeple addition, fire sprinkler install, curbing & grading for asphalt, gym air conditioning, kitchen hood w/ fire suppression, duct work, kitchen propane tank, and soffit/fascia install.


December 2009's Progress

  Action starts again with kitchen hoods, Fire Sprinkler system (orange pipe), Painting, concrete curbing/sidewalk, steeple, Ice storage tanks, and Baptismal remodel.


October/November 2009's Progress

  Additional fire line inspections, front yard drains, loxon primer applied prior to painting.


September 2009's Progress

  Multiple trades installing electrical/security pre-wire, a.c. ductwork, elevator rough-in, core drilling, & fire wall construction @ Youth room. Steel piping for Chilled water system.


August 2009's Progress

  August brought about completion of exterior tower framing & install, stucco completion, and arrival of Electricians, HVAC, and Plumbers hard at work on the first floor interior. Second floor framing is 90% finished, kitchen hoods and elevator equipment onsite.


July 2009's Progress

  July progress includes starting exterior stucco, installation of trusses & sheathing, first floor plumbing, windows installed in gym & partial meeting room, interior metal framing on first floor, concrete/block enclosure for walk-in coolers, and continued work on metal fascia /soffit on 2nd floor.


June 2009's Progress

  Completion of steel structure, 2:00a.m. concrete pour on 2nd floor, concrete block on second floor and gymnasium roof & insulation


May 2009's Progress

  Project is Pushing Forward with the installation of the block walls, concrete tie beams, structural steel I-beam supports, 2nd floor concrete slabs and stairways.


April 2009's Progress

  The slab has been poured and walls are begining to form.

[click photo to zoom in]


March 2009's Progress

  Preparing the grounds.

[click photo show to zoom in]


February 2009's Progress

  A wall has been constructed around the property and piping has been laid.

[click photo show to zoom in]


August 2008's Progress

  August brought us grass seed!


July 2008's Progress

 Once July rolled in, no one could believe their eyes, a pond!  Things are starting to take shape.  God is good!


June 2008's Progress

 

June saw the beginning of the new pond and prepping of the new build site.


May 2008's Progress

 

During the month of May, exciting progress was made in clearing and cleaning up the property in preparation for the next phase of construction.


May 2008's Progress Continues
 

 

With each new day, came new progress and with new progress came new pictures to share.

 


April 2008's Progress

 

We broke ground on April 11, 2008.  They cut all the trees and mulched the limbs and roots.



Site Developed, Hosted and Maintained by Synergy Incorporated © 2026.